Equipment: Tricel UK 8 & SEPS - NRV and catchpit must also be looked at and photographed - Barriers maybe needed
Description:
AM slot. Please change the pump if required, owners have the new pump. The drain on the main road needs to be checked and photos taken as well please.**** Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Callout to amber beacon Site address: Walton Property Management 381 Litchfield Road Sutton Coldfield B74 4DH Callout to your off mains drainage system. Includes two Engineers and one hour onsite. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Purchase order: 95607 Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Standard service to your off mains drainage system. - I know this is not due on our schedule until next month, however we are noticing a bit of an odour internally near the toilet closest to the pit- which previously occurred when there was a slight back up/blockage (as per the last service). Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Constantine Bay, Padstow PL28 8JQ, UK
Site: The Garden House
Equipment: Conder HDPE ASP8 Sewage Treatment Plant 395.00 1975.00 With integral blower
Description:
*BOOKED FOR PM ** Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Broomheath Ln, Tarvin, Chester CH3 8HD, UK
Site: Ettrick House
Equipment: Klargester BD
Description:
Booked for first job between 8-9am - Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage.
Full Address: Church St, Whatton, Nottingham NG13 9EL, UK
Equipment: WW system
Description:
BOOKED FOR PM SLOT. Pending payment ** Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Booked for 8.30 Remedials - Two waste water engineers on site for three hours. Installation of new; compressor lid, base and clips new FujiMAC compressor Five metres new airline One new outdoor socket coring through the slab
Equipment: 1100mm Dia x 1500mm Deep Twin Pump Station, Pump - EVAK HIPPO 50QS
Description:
Callout booked for late morning/lunch time ish - Shaun has spoken to customer and it is possibly a blockage, previously commissioned on behalf of Marsh (report attached)
Full Address: 3 Meadow Rd, Burton upon Trent, Burton-on-Trent DE14 1TD, UK
Site: 3 Meadow Road
Equipment: Septic tank
Description:
Thank you for your recent enquiry for a sewage system compliance/condition check. You have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. If you have had any issues in the past with your unit, we would recommend that you have a desludge of the system at the time of our visit as a minimum. Please speak to us if you are not sure what level of survey is required.
2man service - booked for 8am meeting clean waste tanker. Please take junction box and glands etc incase these need replacing - this should have been quoted on the last visit or when we were doing the remedials.