Tanker unable to access site
Tanker was unable to access site - Charles report says good access and parking with only needing 10m of hoselay
Toolbox talk/training for engineers on assessing tanker/access during surveys; practical guidance to check approach and turning requirements.
-
Survey did not adequately assess site approach and vehicle access constraints.
Include access checks in survey checklist and job ticket notes so crews are prepared.
Toolbox talk assigned to Rob; pending delivery.
Use this panel for all status changes. Main edit form does not change status.
| From | To | Changed At | By | Note |
|---|---|---|---|---|
| Initial | Resolved | 2026-05-05 21:11:19 | management review | Transcript summary: Tanker unable to access site despite report indicating good access; site approach/lanes cause difficulty. Team agreed surveyors should review access beyond immediate driveway and engineers need awareness. Toolbox talk and survey checklist action logged. Root cause check: partial - Clear deficiency in survey thoroughness; straightforward corrective actions assigned but requires training completion. |
| - | Initial | 2026-03-31 11:01:58 | anonymous | - |